Baobab Field Development - Supporting pipelay and installation activities for this fast track deepwater development in West Africa, liaising with Technip and Subsea 7. This also included management of offshore representation for all vessels, and organising SIMOPs for this busy field development with two drill rigs and two FPSOs. The 6” Gas lift and 12”/16” production PIP flowlines were installed by Deep Blue, and the Skandi Navica and support vessel Seisranger installed the 12” water injection and 6” gas export flowlines in water depths 100 – 1280m