Project Two
Knarr Field Development - This greenfield deepwater development (410m) located in the Norwegian Sector has a water injection and production template tied back to the Knarr FPSO through a bundle and flexible riser system.
Knarr Field Development - This greenfield deepwater development (410m) located in the Norwegian Sector has a water injection and production template tied back to the Knarr FPSO through a bundle and flexible riser system.